Solar PV and electrical system installation projects
by a professional team to international standards
A 3-phase on-grid system with a total capacity of 11.70 kWp, using 18 Longi Hi-Mo X10 650 Wp panels and a Huawei SUN2000 10 kW inverter with Smart PV Optimizers. Installation was completed on 31 May 2026 under the supervision of an electrical engineer, and every item was tested before handover, including earth resistance, Thermal Scan and reverse-power protection, in accordance with the Electrical Installation Standard for Thailand (EIT) B.E. 2564 (2021).
| Project | Client / Type | Year (CE) |
|---|---|---|
| 10 kW 3-Phase Rooftop Solar (11.70 kWp) | Solar PV Installation | 2026 |
| Electrical System Inspection & Thermography | Nimman Group, Khao Yai | 2568–2569 |
| Electrical System PM & Single Line Diagram | Monsanto Thailand, Sakon Nakhon | 2025 |
| Thermal Imaging (Thermography) & PM | PPTC | 2026 |